Certification Body Name:
VDE - VDE Prüf- und Zertifizierungsinstitut GmbH

Back to members

 

CB Acronym: VDE ID #: 10
Url: http://www.vde.com Email:
Phone: Fax: + 49 69 83 06 555
Address 1: Merianstraße 28
Address 2:
City: Offenbach am Main Postal code: 63069
State / Province: DE Country: Germany
Deadline for the next Re-assessment: 2027-04-11
Comments:

Contact person: Klaus Kress Email address: klaus.kress@vde.com
Business phone: + 49 69 83 06 906 Fax: + 49 69 83 06 666
Mobile phone:

 

ENEC ENEC Plus CCA
HAR CIG
CB VDE - Product Category
CABL
CAP
CONT
HOR
HOUS
INST
ITAV
LITE
POW
SAFE
Laboratory Name Acronyme Country City
IPH Institut IPH Germany Berlin
VDE Pruf- und Zertifizierungsinstitut GmbH VDE Germany OFFENBACH AM MAIN
VDE CGC (Guangdong) Testing and Certification Co., Ltd VDE CGC Guangdong China Zhongshan
VDE Testing Technology (Shanghai) Co., Ltd. Suzhou Branch (VDE Global Services Suzhou Branch).(VDE Suzhou Branch) VDE Suzhou Branch China Suzhou
E-CTF type E-CTF Laboratory Name E-CTF Address E-CTF Country Standards Covered Registration date Latest Revision date Report Ref.
E-CTF-2 Siteco GmbH Georg-Simon-Ohm Strasse 50, 83301 Traunreut Germany EN 60598-1:2015+A1:2018 EN IEC 60598-1:2021 EN IEC 60598-1:2021/A11:2022 EN 60598-2-1:1989 EN IEC 60598-2-1:2021 EN 60598-2-2:2012-02 EN 60598-2-3:2003+A1:2011 EN 60598-2-4:2018 EN 60598-2-5:2015-11 EN 60598-2-13+A1+A2:2016 EN 60598-2-13:2006/A11:2021 EN 60598-2-18:1994 + A1:2012 EN IEC 60598-2-18:2022 EN 60598-2-19:1989+Corr.:2005 EN 60598-2-22:2014+A1:2020 EN IEC 60598-2-22:2022 EN 60598-2-24:2013 EN IEC 62031:2020 EN IEC 62031:2020/A11:2021 EN IEC 60598-2-2:2024 EN 62262:2002+A1:2021 2001-07-25 2024-11-04 40508-9501-0001/323586 (40036755)
E-CTF-2 ERCO GmbH Brockhauser Weg 80-82, 58507 Luedenscheid Germany EN 60598-1:2015+A1:2018 EN IEC 60598-1:2021 EN IEC 60598-1:2021/A11:2022 All clauses except the following: 4.4.4 (lampholder pressure test), 4.4.5 (voltage across lampholder), 4.20 (vibration test for rough service luminaires), 9.2.1 (IP5X), 9.2.2 (IP6X),13.3.1 (needle flame test), 13.4.1 (resistance to tracking) EN 60598-2-1:1989 EN IEC 60598-2-1:2021 EN 60598-2-2:2012 EN 60598-2-3:2003+A1:2011 EN 60598-2-4:2018 EN 60598-2-5:2015 EN 60598-2-13:2006+A1:2012+A2:2016 EN 60598-2-18:1994+A1:2012 EN IEC 60598-2-18:2022 EN 60598-2-22:2014+A1:2020 EN IEC 660598-2-22:2022 EN 60570:2003+A1:2018+A2:2020 EN IEC 62031:2020 EN IEC 62031:2020/A11:2021 All clauses except a.c. supplied LED modules EN 60838-1:2017+A1:2017 EN 60838-1:2017+A1:2017+A2:2021+A11:2021 All clauses except 17.4, 17.5, 18.1, 18.2 EN IEC 62471-7:2023 2006-10-10 2024-02-15 411100-9501-0001/316321 (40037505)
E-CTF-2 BEGA Gantenbrink-Leuchten KG Hennenbusch, 58708 Menden Germany EN 60598-1:2015+A1:2018 EN IEC 60598-1:2021 EN IEC 60598-1:2021/A11:2022 All clauses, except cl. 9.2.9 EN 60598-2-1:1989 EN IEC 60598-2-1:2021 EN 60598-2-2:2012 EN 60598-2-3:2003+A1:2011 EN 60598-2-4: 2018 EN 60598-2-5:2015 EN 60598-2-13:2006+A1:2012+A2:2016 EN 60598-2-13:2006/A11:2021 EN 60598-2-18:1994+A1:2012 EN 60598-2-20:2015 EN 60598-2-22: 2014 EN 60598-2-22:2014+A1:2020 EN IEC 60598-2-22:2022 EN 60598-2-24:2013 EN 62031:2008+A1:2013+A2:2015 EN IEC 62031:2020 EN IEC 62031:2020/A11:2021 EN IEC 60598-2-2:2024 All clauses EN IEC 60598-2-20: 2024 EN IEC 60598-2-20/A11: 2024 All clauses EN 62262:2002+A1:2021 All clauses EN IEC 62471-7:2023 All clauses 2016-01-09 2024-01-09 428400-9501-0001/323252 (40039235)
E-CTF-2 REGIOLUX GmbH Hellinger Strasse 3, 97486 Königsberg Germany EN 60598-1:2015 + A1:2018 all clauses except 9.2 / 9.3 / 10 / 13 EN IEC 60598-1:2021 EN IEC 60598-1:2021/A11:2022 all clauses except 9.2 / 9.3 / 10 / 13 EN 60598-2-1:1989 EN IEC 60598-2-1:2021 EN 60598-2-2:2012 EN 60598-2-4:2018 all clauses EN 60598-2-22:2014+A1:2020 all clauses except 22.17 EN IEC 60598-2-22:2022 EN 60598-2-2:2012 all clauses EN 60598-2-24:2013 all clauses EN 60598-2-22:2014 all clauses except 22.17 2006-12-08 2024-06-19 428500-9501-0001/320070 (40036756)
E-CTF-1 Ansorg GmbH Pilgerstrasse 11, 45473 Mülheim/Ruhr Germany EN 60598-1:2015+A1:2018 EN IEC 60598-1:2021 EN IEC 60598-1:2021/A11:2022 All clauses except 9, 10, 12.3, 13.2, 13.3.1, 13.4 EN 60598-2-1:1989 EN IEC 60598-2-1:2021 EN 60598-2-2:2012 EN 60598-2-4: 2018 All clauses EN 60598-1:2015+A1:2018 all clauses except 9, 10, 12.3, 13.2, 13.3.1, 13.4 EN 60598-2-22: 2014 EN 60598-2-22:2014+A1:2020 EN IEC 60598-2-22:2022 all clauses except 22.13.1, 22.14, 22.16, 22.17, 22.18, 22.19, 22.21 EN IEC 60598-2-2:2024 All clauses 2004-07-21 2024-06-28 808800-9501-0001/319629 (40038002)
E-CTF-2 BJB GmbH & Co. KG Werler Strasse 1, 59755 Arnsberg Germany EN IEC 60238:2018+A1:2018 EN IEC 60238:2018+A1:2018+A2:2021 EN 60400:2017 EN 60400:2017+A1:2021 EN 61184:2017 EN 60838-1:2017 N 60838-1/A1:2017 EN 60838-1:2017+A1:2017+A2:2021+A11:2021 EN IEC 62031:2020 EN IEC 62031:2020/A11:2021 All clauses, except clause 21 (22 PHOTOBIOLOGICAL SAFETY) 2008-07-07 2023-12-07 14600- 9501-0001/312228 (40038937)
E-CTF-3 Inventronics GmbH Parkring 31-33, 85748 Garching Germany EN 61347-1:2015 EN 61347-1:2015+A1:2021 EN 61347-2-2:2012 EN 61047:2004 EN 61347-2-3:2011+A1:2017 EN 60929:2011+A1:2016 EN 61347-2-11:2011+A1:2019 EN 61347-2-12:2005+A1:2010 EN 61347-2-13:2014+A1:2017 EN 62384:2006+A1:2009 EN IEC 62384:2020 EN 62031:2008+A1:2013+A2:2015 EN IEC 62031:2020 EN IEC 62031:2020/A11:2021 2013-11-04 2023-03-09 5017767-9501-0001/300288 (40038719)
E-CTF-2 PIT GmbH Am Sseerain Nr. 3, 35232 Dauthphetal-Buchenau Germany EN 60598-1:2015+A1:2018 EN IEC 60598-1:2021 EN IEC 60598-1:2021/A11:2022 EN 60598-2-1:1989 EN IEC 60598-2-1:2021 EN 60598-2-2:2012 EN 60598-2-5:2015 EN 60598-2-22:2014+A1:2020 EN IEC 60598-2-22:2022 EN 60598-2-24:2013 valid for all listed standards: accepted clauses: 3, 12 (except 12.3) 2006-10-12 2023-09-28 527600-9501-0001/309281 (40038930)
E-CTF-2 RIDI Leuchten GmbH Hauptstraße 31-33, 72417 Jungingen Germany EN 60598-1:2015+A1:2018 (All clauses, except: 9, 10, 13.2, 13.3.1, 13.4, 15) EN IEC 60598-1:2021 EN IEC 60598-1:2021/A11:2022 All clauses, except: clause 1.13 (9), clause 1.14 (10), clause 1.15 (13.2, 13.3.1, 13.4) (numbers in brackets refer to the relevant clauses of 60598-1) EN 60598-2-1:1989 EN IEC 60598-2-1:2021 All clauses, except: clause 1.13 (9), clause 1.14 (10), clause 1.15 (13.2, 13.3.1, 13.4) (numbers in brackets refer to the relevant clauses of 60598-1) EN 60598-2-2:2012 EN IEC 60598-2-2:2024 All clauses, except: clause 2.14 (9), clause 2.15 (10), clause 2.16 (13.2, 13.3.1, 13.4) (numbers in brackets refer to the relevant clauses of 60598-1) EN 60598-2-3:2003+A1:2011 All clauses, except: clause 3.13 (9), clause 3.14 (10), clause 3.15 (13.2, 13.3.1, 13.4) (numbers in brackets refer to the relevant clauses of 60598-1) EN 60598-2-4: 2018 All clauses, except: clause 4.14 (9), clause 4.15 (10), clause 4.16 (13.2, 13.3.1, 13.4) (numbers in brackets refer to the relevant clauses of 60598-1) EN 60598-2-5:2015 All clauses, except: clause 5.13 (9),clause 5.14 (10), clause 5.15 (13.2,13.3.1, 13.4)(numbers in brackets refer to the relevant clauses of 60598-1) EN 60598-2-22:2014+A1:2020 EN IEC 60598-2-22:2022 All clauses, except: clause 22.14 (9), clause 22.15 (10), clause 22.16 (13.2, 13.3.1, 13.4), clause 22.17, clause 22.18, clause 22.19, clause 22.20, clause 22.21 (numbers in brackets refer to the relevant clauses of 60598-1) EN 60598-2-24:2013 All clauses, except: clause 24.14 (9), clause 24.15 (10), clause 24.16 (13.2, 13.3.1, 13.4) (numbers in brackets refer to the relevant clauses of 60598-1) EN IEC 62031:2020 EN IEC 62031:2020/A11:2021 All clauses, except: clause 11, clause 12 EN 60570:2003+A1:2018 EN 60570:2003+A1:2018+A2:2020 IEC 60570:2003 All clauses, except: clause.14 (9), clause.15 (10), clause.17 (13.2, 13.3.1, 13.4) (numbers in brackets refer to the relevant clauses of 60598-1) 2016-02-24 2024-08-05 565600-9501-0001/319801 (40043767)
E-CTF-2 A. u. K. Müller gmbH & Co. KG Dresdener Straße 162, 40595 Düsseldorf Germany EN 60730-1:2016+A1:2019 EN 60730-1:2016/A2:2022 Accepted clauses 12 – 17, 18, 27 EN IEC 60730-2-8:2020 EN IEC 60730-2-8:2020+A1:2021 Accepted clauses 12 – 17, 18, 27 for 18 Appendix BB; Appendix CC 2016-08-29 2024-07-18 513100-9501-0006/320846 (40044847)
E-CTF-2 NORKA Norddeutsche Kunststoff- und Elektrogesellschaft Stäcker mbH & Co. KG Lange Straße 1, 27313 Dörverden-Hülsen Germany EN 60598-1:2015+A1:2018 EN IEC 60598-1:2021 EN IEC 60598-1:2021/A11:2022 EN 60598-2-1:1989 EN IEC 60598-2-1:2021 EN 60598-2-2:2012 EN 60598-2-3:2003+A1:2011 EN 60598-2-4:2018 EN 60598-2-5:2015 EN 60598-2-13:2006+A1:2012+A2:2016 EN 60598-2-18:1994+A1:2012 EN 60598-2-22:2014+A1:2020 except of self-contained luminaires EN 60598-2-22: 2014 except of self-contained luminaires EN 60598-2-22:2014+A1:2020 except of self-contained luminaires EN 60598-2-24:2013 2007-09-30 2024-01-16 2486300-9501-0001/312670 (40036260)
E-CTF-3 Inventronics S.R.L. Via Castagnole 65a, 31100 Treviso Italy EN 62717:2017/A2:2019 EN IEC 62722-2-1:2023 Except tests with the gonio photometer 2016-03-08 2023-11-09 4343100-9501-0001/309777 (40043907)
E-CTF-2 RZB Rudolf Zimmermann Bamberg GmbH Rheinstraße 16, 96052 Bamberg Germany EN 60598-1:2015+A1:2018 EN IEC 60598-1:2021 EN IEC 60598-1:2021/A11:2022 All clauses except 9.2.1, 9.2.2 EN 60598-2-1:1989 All clauses EN IEC 60598-2-1:2021 EN IEC 60598-1:2021/A11:2022 All clauses except 9.2.1, 9.2.2 EN 60598-2-2:2012 DIN EN 60598-2-2(VDE 0711-2-2):2012-10 EN 60598-2-2:2012 IEC 60598-2-2:2011 DIN EN 60598-2-2(VDE 0711-2-2):2012-10 EN 60598-2-2:2012 IEC 60598-2-2:2011 DIN EN 60598-2-2(VDE 0711-2-2):2012-10 EN 60598-2-2:2012 IEC 60598-2-2:2011 All clauses Luminaires – Part 2-2: Particular requirements – Recessed luminaires Luminaires – Part 2-2: Particular requirements – Recessed luminaires Luminaires – Part 2-2: Particular requirements – Recessed luminaires EN IEC 60598-2-2:2024 All clauses EN 60598-2-3:2003+A1:2011 EN 60598-2-4:2018 EN 60598-2-5:2015 EN 60598-2-8:2013 EN 60598-2-10:2003 All clauses EN 60598-2-11:2013+A1:2022 EN 60598-2-13:2006+A1:2012+A2:2016 EN 60598-2-13:2006/A11:2021 All clauses EN IEC 60598-2-17:2018 EN 60598-2-18:1994+A1:2012 EN IEC 60598-2-18:2022 EN 60598-2-19:1989 EN 60598-2-19/A2:1998 EN 60598-2-22:2014+A1:2020 EN IEC 60598-2-22:2022 EN 60598-2-24:2013 EN 60598-2-25:1994+A1:2004 2009-11-25 2024-08-09 28100-9501-0001/320113 (40038045)
E-CTF-2 Performance in Lighting GmbH Stapelner Straße 1+3, 38644 Goslar Germany EN 60598-1:2015+A1:2018 EN IEC 60598-1:2021 EN IEC 60598-1:2021/A11:2022 All Clauses, except 9.2.1 - 9.2.9, 9.3, 13.3, 13.4 EN 60598-2-1:1989 EN IEC 60598-2-1:2021 EN 60598-2-2:2012 EN 60598-2-4: 2018 EN 60598-2-22: 2014 EN 60598-2-22:2014+A1:2020 EN IEC 60598-2-22:2022 EN 60598-2-24:2013 All Clauses 2009-11-23 2024-04-24 1991000-9501-0001/317935 (40039365)
E-CTF-2 Vossloh-Schwabe Deutschland GmbH Stuttgarter Straße 61/1 73614 Schorndorf Germany EN 61347-1:2015 EN 61347-1:2015 + A1:2021 EN 61347-1:2008 + A1 + A2:2013 EN 61347-2-2:2012 EN 61047:2004 EN 61347-2-1:2001+A1:2006+A2:2014-02 EN 61347-2-3:2011+A1:2017 EN 60929:2011+A1:2016 EN 61347-2-7:2012+A1:2019+A2:2022 EN 61347-2-8:2001+A1:2006 EN 60921:2004+A1:2006 EN 61347-2-9:2013 EN 60923:2005+A1:2006 EN 61347-2-11:2001+A1:2019 EN 61347-2-12:2005+A1:2010 EN 61347-2-13:2014+A1:2017 EN IEC 62384:2020 EN IEC 62031:2020 EN IEC 62031:2020/A11:2021 EN 60570:2003+A1:2018 EN 60570:2003+A1:2018+A2:2020 EN 60838-1:2017 EN 60838-1/A1:2017 EN 60838-1:2017+A1:2017+A2:2021+A11:2021 EN 60400:2017 EN 60400:2017+A1:2021 EN IEC 62471-7:2023 2019-12-19 2024-05-28 2378800-9501-0005/322594 (40045571)
E-CTF-2 TRILUX GmbH & Co. KG Heidestraße 4, 59759 Arnsberg Germany EN 60598-1:2015+A1:2018 EN IEC 60598-1:2021 All clauses except clause 9.2.8, 9.2.9 EN 60598-2-1:1989 EN IEC 60598-2-1:2021 EN 60598-2-2:2012 EN 60598-2-3:2003+A1:2011 EN 60598-2-4: 2018 EN 60598-2-5:2015 EN 60598-2-13:2006+A1:2012+A2:2016 EN 60598-2-13:2006/A11:2021 EN 60598-2-22:2014+A1:2020 EN IEC 60598-2-22:2022 EN 60598-2-24:2013 EN 60598-2-25:1994+A1:2004 2014-02-10 2023-12-12 299800-9501-0001/309204 (40039373)
E-CTF-3 Inventronics S.R.L. Via Castagnole No. 65a 31100 TREVISO TV Italy EN 60598-1:2015+A1:2018 EN IEC 60598-1:2021 EN IEC 60598-1:2021/A11:2022 EN 60598-2-1:1989 EN IEC 60598-2-1:2021 EN 60598-2-2:2012 EN 60598-2-22:2014+A1:2020 EN IEC 60598-2-22:2022 All clauses except of self-contained luminaires EN 62031:2008+A1:2013+A2:2015 EN IEC 62031:2020 EN IEC 62031:2020/A11:2021 EN 61347-1:2015 EN 61347-1:2015+A1:2021 EN 61347-2-2:2012 EN 61347-2-11:2001+A1:2019 EN 61347-2-13:2014+A1:2017 EN 62384:2006+A1:2009 EN IEC 62384:2020 2009-08-18 2023-11-09 4343100-9501-0001/309773 (40037620)
E-CTF-2 WE-EF LEUCHTEN GmbH Toepinger Straße 16, 29646 Bispingen Germany EN 60598-1:2015+A1:2018 All clauses, except 4.13, 4.24, 9.3 and 10 EN IEC 60598-1:2021 EN IEC 60598-1:2021/A11:2022 All clauses, except 4.13, 4.24, 9.3 and 10 EN 60598-2-1:1989 EN IEC 60598-2-1:2021 EN 60598-2-2:2012 EN 60598-2-3:2003+A1:2011 EN 60598-2-5:2015 EN 60598-2-13:2006+A1:2012+A2:2016 All clauses, except 13.6.1 and 13.6.2 EN 60598-2-18:1994+A1:2012 EN IEC 60598-2-18:2022 2016-02-16 2023-12-11 823100-9501-0001/312544 (40043766)
E-CTF-2 Adolf Schuch GmbH Lichttechnische Spezialfabrik Mainzer Str. 172, 67547 Worms Germany EN 60598-1:2015 +A1:2018 EN IEC 60598-1:2021 EN IEC 60598-1:2021/A11:2022 EN 60598-2-1:1989 EN IEC 60598-2-1:2021 EN 60598-2-2:2012 EN 60598-2-3:2003 +A1:2011 EN 60598-2-5: 2015 EN 60598-2-22:2014 EN 60598-2-22:2014+A1:2020 EN IEC 60598-2-22:2022 EN 60598-2-24:2013 all clauses 2014-05-12 2024-06-20 39600-9501-0001/319807 (40039893)
E-CTF-3 TRILUX GmbH & Co. KG Heidestraße 4, 59759 Arnsberg Germany EN 62717:2017+A2:2019 EN 62717:2017 PD EPRS 001:2018-05 EN 62722-1:2016 PD EPRS 002:2018-05 EN 62722-2-1:2016 PD EPRS 003:2018-05 2016-12-19 2023-12-14 299800-9501-0001/309282 (40045576)
E-CTF-2 WALTHER-WERKE Ferdinand Walther GmbH Ramsener Str. 6, 67304 Eisenberg Germany EN 60309-1:1999+A1:2007+A2:2012 EN 60309-2:1999+A1:2007+A2:2012 Accepted clauses 7; 8; 9; 12; 13; 14; 15; 16; 17; 18 (without Dust); 19; 22; 23; 24; 25; 26; 27 (without 27.5); 28 2018-07-27 2023-03-28 247000-9501-0001/299901 (40048560)
E-CTF-2 KEDU Electric Co.,Ltd. Building 1, No.88, Songqiao street, 310018 QIANTANG DISTRICT, HANGZHOU China EN IEC 60947-1:2021 (No tests) EN 60947-2:2017+A1:2020 (All clauses except EMC) EN IEC 60947-3:2021 (All clauses except EMC) EN IEC 60947-4-1:2019 (All clauses except EMC) EN 60947-5-1:2017 (All clauses except EMC) EN 60898-1:2019 EN 60898-2:2021 EN 61008-1:2012+A1:2014+ A1:2014/AC:2016+A2:2014+ A11:2015+A12:2017 (All clauses except EMC) EN 61008-2-1:1994+A11:1998+Corr. 1999 (All clauses except EMC) EN 61009-1:2012+A1:2014+A2:2014+ A11:2015 + A12:2016+A13:2021 (All clauses except EMC) EN 61009-1:2012+A1:2014+ A2:2014+A11:2015+A12:2016 (All clauses except EMC) EN 62423:2012+A11:2021 (All clauses except EMC) EN IEC 61058-1:2018 EN 61058-1-1:2016 2022-09-28 2023-10-27 5029586-9501-0001/310302 (40052023)
E-CTF-2 Inventronics Guangzhou Technology Ltd Shenzhen Branch Unit 201, 2F, Blk. B, Emerging Ind. Park No.3151, Shahe West Road Xili, Nanshan District, 518055 SHENZHEN China EN 61347-1:2015 + A1:2021 All clauses except clause 18.2, 18.5 and Annex N EN 61347-2-13:2014+A1:2017 All clauses EN IEC 62384:2020 All clauses 2023-06-23 2024-08-14 5030378-9501-0001/322616 (40056989)
Scheme Given name Family name Location Certification decision Signatory Scope limitation Terminated
CCA, ENEC, ENEC+, HAR Klaus Dr. Kress Offenbach 2003-09-04 2003-09-04 --
CCA, ENEC, ENEC+, HAR Andreas Fabian Offenbach 2013-04-01 2013-04-01 --
CCA, ENEC, ENEC+, HAR Jan Richter Offenbach 2016-07-19 2016-07-19 --
CCA, ENEC, ENEC+, HAR Gerhard Heine Offenbach 2014-12-10 2014-12-10 --
CCA, ENEC, ENEC+, HAR Holger König Offenbach 2016-10-18 2016-10-18 -- 2023-10-26
CCA, ENEC, ENEC+, HAR Bernhard Megerle Offenbach 2019-06-19 2019-06-19 -- 2023-10-26
CCA, ENEC, ENEC+, HAR Rainer Nickel Offenbach 2015-12-21 2015-12-21 -- 2024-09-30
CCA, ENEC, ENEC+, HAR Mario Tasotti Offenbach 2014-07-23 2014-07-23 --
CCA, ENEC, ENEC+, HAR Josef Winzig Offenbach 2004-06-03 2004-06-03 -- 2021-08-31
CCA, ENEC, ENEC+, HAR Günter Dr. Schipper Offenbach 2003-04-14 2003-04-14 -- 2023-10-26
CCA, ENEC, ENEC+, HAR Ackermann Marco Offenbach 2021-09-06 2021-09-06 --
CCA, ENEC, ENEC+, HAR Tobias Stenger Offenbach 2023-03-01 2023-03-01 --
CCA, ENEC, ENEC+, HAR Thomas Baumann Offenbach 2021-06-01 2021-06-01 --
CCA, ENEC, ENEC+, HAR Thorsten Lortz Offenbach 2024-10-15 2024-10-15 --
Given name Family name Location Registered date Terminated date
Thomas BILZ Germany 2021-04-13
Hans-Jörg GÖLLNER Germany 2021-04-13
Rene GRAU Germany 2021-04-13
Stefan JAKOBY Germany 2021-04-13
Dieter KNÜSTING Germany 2021-04-13
Markus KREMEIER Germany 2021-04-13
Richard LABUDE Germany 2021-04-13
Christoph MAUL Germany 2021-04-13
Felix PIEHL Germany 2021-04-13
Klaus SCHUMACHER Germany 2021-04-13
Henrik URBAHN Germany 2021-04-13
Markus VERGÉ Germany 2022-01-13
Karsten WOLF Germany 2021-04-13
Virgil BUDISTEANU Romanian 2021-04-13
Pankaj CHAUDHURY India 2021-04-13
Murat CIFTCI Turkey 2021-04-13
Jorge DE LA CONCHA Mexico 2021-04-13
Marek DURA Poland 2021-04-13
Adnan KOSEOGLU Turkey 2021-04-13
Karel LISKA Czech Republic 2021-04-13
Daniel RODERO Spain 2021-04-13
Metin SAVASKAN Turkey 2021-04-13
Fouad SELLAH Morocco 2021-04-13
Michel SINQUIN France 2021-04-13
Ivan STAMBOLIEV Bulgarian 2021-04-13
Alessandro SARTORI Italy 2021-04-13
Arnd ROTH Germany 2021-04-13
Helmut BÖHN Germany 2021-04-13
Tobias STENGER Germany 2021-04-13
Paul LI China 2021-04-13
Arnold NAMUJHE China 2021-04-13
Crystal WEI China 2021-04-13
Raphael YANG China 2021-04-13
Johnny Xiangdong YANG China 2021-04-13
Shuzo HONDA Japan 2021-04-13
Hideki NISHIMURA Japan 2021-04-13
Dohyun CHO Korea 2021-04-13
Jack JEONG Korea 2021-04-13
Yong Ho JEONG Korea 2021-04-13
Seonah KIM Korea 2021-04-13
Anthony KOO Korea 2021-04-13
John PARK Korea 2021-04-13
Peter LIU Taiwan 2021-04-13
Yung Kuo TSENG Taiwan 2021-04-13
Weiwei GUO China 2021-04-13
Priest HE China 2021-04-13
Devin HO China 2021-04-13
Yi HUANG China 2021-04-13
Junfeng HUI China 2021-04-13
Marin LOU China 2021-04-13
Mountain MU China 2021-04-13
Ryan OU China 2021-04-13
Eric QIU China 2021-04-13
Vector SITU China 2021-04-13
Edwin TONG China 2021-04-13
Evan WANG China 2021-04-13
Roger WANG China 2021-04-13
Taylor XU China 2021-04-13
Ling YI China 2021-04-13
Harry ZOU China 2021-04-13
Meng-Ling LEE Taiwan 2023-03-17
Younes EL ACHABI Germany 2023-11-07
Bernhard MEGERLE Germany 2023-11-27
Isabella SZCZUKOWSKI-DEPTA Germany 2024-04-22
Holger SCHMIED Germany